The first task was to find the corner posts of the new building. Sounds easy, right? We had the side of the garage which we presumed was straight. All we needed to do was to find the other 3 walls.....on an uneven slope....in the cold.... I made a long tape measure with duct tape and twine, so that we could measure longer than our 50' tape measure could reach.
We started with 4 ft out and we knew eventually it would be 3 ft down. So we placed a post every 4 ft from the garage on both sides.....
starting at the top and moving down the mountain in what we assumed was a straight line. We used a plumb bob to make sure each post was vertical.
Then we tried to find the bottom corners and make sure they were square. Some of you reading this might see the error in our ways. We just had no idea about how to come up with square corners. We did A LOT of math that day. Listen up, kiddies, you really DO need to pay attention in Math Class. We had additional troubles since the ground was still frozen where we wanted to pound our stakes in.
We did the 3,4,5 triangle method, and still it didn't work. Then we thought we'd try measuring the diagonals and found that we couldn't make that match either. We were out of luck. It was close, just not as close as we wanted it. Then it snowed!!! May 15th or so. We couldn't believe it! That put us back a couple of days. June 1st was looming and we had to have the roof up. Too bad there was no way to get a little back hoe over to that spot.
As we continued the more we kept wondering how we would dig out the dirt during the winter? It wasn't long before I realized we would need to dig the levels now---before we built the walls. Curt started where we thought the steps were going to go. It would be a huge amount of work to get ready before June 1.
So I hired my friend Nick. He and I worked on it for 8 hours the first day. Curt and I continued working on it. We started at the top since that was unfrozen and worked our way down the mountain. Sometimes Curt had to pick ax through the ice.
Finally we were ready for the posts. I had ordered Alaska Timbers from Indian. I wanted this to be an all Alaskan, all natural greenhouse. Sadly the sawyer got the flu and couldn't get out of bed to deliver the wood. Because time was of the essence, we had to scramble. On Craig's list we found some old railroad ties. We borrowed the neighbor's snowmachine trailer and went to get them. Yes they leach into the ground some, but on the other hand, I support railroads and we need to do something with the old railroad ties rather than throw them in the landfill. Why not reuse them?
But then came the problem: ICE! Not just the stuff we could expose to the sun and let it melt. It was more like permafrost. We needed to call in the big guns! :0)
11 holes with that thing! It was crazy! |
It took a little bit of effort to get those humongous railroad ties in place too.
Thanks goodness for the dolly! |
We brought it to the edge and flipped it down onto the right level. |
We lined it up on the hole |
We had to level it on its broken piece of cement |
Curt lifted it in. |
Once leveled we tamped in dirt all around it |
We were so happy to get rid of the auger and wanted to rest, but June 1st was coming fast.
The old garden cart needed a rest though. Curt worked it hard!